COMPARATIVE ANALYSIS OF BUILDING COST BUDGET PLANS USING
SNI AND BOW METHODS
Taufik Safi’i Abdullah, Suryo Handoyo, Erni Mulyandari
Universitas Tunas Pembangunan, Indonesia
ABSTRACT
Building budget design (RAB) is a way to calculate the costs that will be required from a
building and with this cost the building can be realized as planned. In Indonesia, there are
methods for planning the unit cost price of project budgets, namely BOW (Burgelijke
Openbare Werken) and SNI (Regulation of The Ministry of Public Works and Housing
Republic Indonesia Number 1 of 2022 concerning Guidelines for Preparing Estimated
Costs of Construction Work in the Field of Public Works and Public Housing) where the
SNI method is an adjustment and renewal of the BOW analysis which is an analysis of
the legacy of the Dutch Government which contains a labor-intensive and conventional
work system. However, the reality in the field is that the BOW method is still widely used
for building construction work because the coefficient used is greater than using the SNI
method so that it is possible to get a greater profit. This study aims to find out the RAB
of the SNI and BOW methods and then find out the difference to be an alternative
reference in planning construction costs with the SNI and BOW methods and add insight.
In the calculation of the budget plan for concrete work costs for the construction of the
UPN Veteran Yogyakarta Integrated Research Laboratory Building using 2 methods, the
SNI method was obtained at Rp 9,659,059,280.45 while using the BOW method at Rp
14,474,237,708.85. The difference between the SNI and BOW method budget plans is Rp
4,815,178,428.39.
Keyword: RAB, SNI, BOW
INTRODUCTION
The Construction Project of the Integrated Research Laboratory Building of
Universitas Pembangunan Nasional Veteran Yogyakarta has a building height of 34.32
meters with a total of 6 floors consisting of the ground floor, 1st floor, 2nd floor, 3rd floor,
4th floor, and 5th floor which has a building area of 7200 m2. The project is planned to
be completed in August 2023. The location of this project is located on Jl. Padjajaran
(SWK) No 104, Condongcatur, Depok District, Sleman Regency, Special Region of
Yogyakarta, 55281. Building budget design (RAB) is a way to calculate the costs that will
be required from a building and with this cost the building can be realized as planned
(Romadhona et al., 2021). The draft building cost budget is very necessary considering
the very large and extensive building that must be calculated very carefully and diligently
to minimize errors in cost calculations (Juansyah et al., 2017). SNI is an update of the
BOW analysis (Burgerlijke Openbare Werken) 1921, in other words, SNI analysis is an
updated BOW analysis. Qadir, (2022) said SNI analysis is issued by the Center for